?W?=?q?V


Work is done when moving a point charge away from another charge
The potentials at points?R?and?S?due to the +7.0 nC charge are 675 V and 850 V respectively.
Calculate how much work is done when a +3.0 nC charge is moved from?R?to?S.
Step 1: Write down the known quantities
Step 2: Write down the work done equation
W?=?qΔV
Step 3: Substitute in the values into the equation
W = (3.0 × 10-9) × (850 - 675) = 5.3 × 10-7?J
Remember that?q?in the work done equation is the charge that is being moved, whilst?Q?is the charge which is producing the potential. Make sure not to get these two mixed up, as both could be given in the question (like the worked example) and you will be expected to choose the correct one


Equipotential lines around a radial field or uniform field are perpendicular to the electric field lines
轉(zhuǎn)載自savemyexams
以上就是關(guān)于【AQA A Level Physics復(fù)習(xí)筆記7.5.3 Work Done on a Charge】的解答,如需了解學(xué)校/賽事/課程動態(tài),可至翰林教育官網(wǎng)獲取更多信息。
往期文章閱讀推薦:
斯坦福大學(xué)官方推薦書單!名校學(xué)霸們暑假都在讀什么?
MIT官方發(fā)布【2026年夏季推薦閱讀書單】!橫跨科學(xué)/人文/經(jīng)濟...

? 2026. All Rights Reserved. 滬ICP備2023009024號-1